Avon Products
|
|
|
Wastewater Pre-Treatment
Neutralization Systems Controls VT Design Solutions provided the electrical and controls design for Neutralization and Time Delay Tank Systems as part of Avon’s Wastewater Pre-Treatment & Recirculation System upgrade project. Design effort required a fast paced execution with a sequencing plan that allowed for installation and integration with minimal impact on existing operations.
|
![]()