Cincinnati Children’s Hospital Medical Center
|
|
|
Chiller Construction Support
Location B VT Design Solutions was part of the engineering design team that performed the construction support and building commissioning for the chiller addition installation in Location B or the Main Building on the campus. The design engineering involved the commissioning and the check-out of the distribution center for the supply of the chiller. Our work tasks involved verifying instrument locations and verifying wiring and design.
|
![]()
Rollover to change |
|
Manufacturing and Packaging Engineering
Building Systems MEP Engineering & Design |
155 Tri-County Parkway, Suite 230, Cincinnati, Ohio 45246 5200 Springfield St., Suite 320, Dayton, Ohio 45431 |
Building Systems Commissioning
Construction Management Support |